May 2013
2013 |
|
We will be at the exhibiting at the SAMPE Long Beach USA Show on 6th to 9th May 2013
|
|
|
March
2013 |
|
We will be at the exhibiting at the JEC Composites Show in Paris on 12, 13 and 14 March 2013
|
|
|
February
2013 |
|
Our clients Regent Aerospace order a 3rd HVA-3
|
|
|
February
2013 |
|
We are currently improving our production facilities by installing a Bystronic Fiber Laser Cutter
|
|
|
Late
2012 |
|
In late 2012 we delivered and installed HDF-6 machines in TAL India and Boeing Seattle
|
|
|
Late
2012 |
|
In late 2012 we delivered and installed HVA machines at SASCO Singapore and Regent Aerospace in Grand Prairie Texas
|
|
|
June
2012 |
|
We will be at the exhibiting at the JEC Composites Asia Show in Singapore on 26, 27 and 28 June 2012,
stand number K5
|
|
|
September
2010 |
|
In September 2010 we exhibited at the
Composites Engineering Show at the NEC in Birmingham, UK
|
|
|
|
|
|
|
|
|
May
2010 |
|
In May we exhibited at
Sampe 2010 Seattle |
|
 |
|
|
|
|
|
|
April
2010 |
|
We recently exhibited at the
JEC show in Paris with our agent
Multistation. |
|
 |
|
|
|
|
|
|
March
2010 |
|
The first of our new 2010 model heat and vacuum applicators
are shipped. |
|
 |
|
|
|
|
|
|
October
2009 |
|
Heat and vacuum press for
aircraft interiors installed in Hong Kong.
|
|
 |
|
|
|
|
|
October
2009 |
|
Lam-tech recently exhibited at the
Composites Sourcebook Show. Visitors had the opportunity to meet Lam-tech senior engineers and learn how our machinery can reduce their production times. |
|
|
|
|
|
|
|
September
2009 |
|
Two new HDF Hot Drape Formers have just been installed at Boeing in Seattle. Both machines (one measuring 13ft x 6ft, the other 6ft x 4ft) will be used to form carbon parts for Boeing aircraft. |
|
 |
|
|
|
|
|
May
2009 |
|
www.herefordtimes.com/news/business/4402869.Astronaut_lands_in_Knighton_for_talks/ |
|
 |
|
|
|
|
|
|
April
2009 |
|
Our new generation Hot Drape Former is installed in The University of Limerick's Composite Centre in Ireland. |
|
 |
|
|
|
|
|
|
September
2008 |
|
6.5 x 2 metre Hot Drape Former supplied to Hitco Carbon Composites for the Boeing 787 programme. |
|
 |
| |
|
|
|
|